Böhme, T, Escribano, A, Heffernan, E E and Beazley, S (2018) Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector. Built Environment Project and Asset Management, 8(03), 253–66.

Hasan, A, Elmualim, A, Rameezdeen, R, Baroudi, B and Marshall, A (2018) An exploratory study on the impact of mobile ICT on productivity in construction projects. Built Environment Project and Asset Management, 8(03), 320–32.

Javed, A A, Pan, W, Chen, L and Zhan, W (2018) A systemic exploration of drivers for and constraints on construction productivity enhancement. Built Environment Project and Asset Management, 8(03), 239–52.

Ling, F Y Y (2018) International comparison of performance of public projects. Built Environment Project and Asset Management, 8(03), 281–92.

  • Type: Journal Article
  • Keywords: China; Public sector; Quality; Time; Cost efficiency; Performance levels;
  • ISBN/ISSN: 2044-124X
  • URL: https://doi.org/10.1108/BEPAM-08-2017-0059
  • Abstract:
    The purpose of this paper is to investigate the performance of public projects in Beijing, Hong Kong, Singapore and Sydney to uncover which areas project managers should focus on when managing public projects in different countries. Design/methodology/approach Based on the literature review, a structured questionnaire was designed to collect data of completed public projects. In total, 244 sets of data of completed public projects were collected. Findings Significant cost and schedule overruns are found in all four cities. Hong Kong’s public projects have the highest cost and schedule overruns. Singapore’s public projects have the lowest cost overrun and Beijing’s projects have the lowest schedule overrun. Public projects in all four cities recorded significantly good project quality. Research limitations/implications The findings are not easily generalizable due to the relatively small sample size in Sydney, low response rate and data being collected from only four cities. The research implication is that the plethora of project management strategies does not seem effective in preventing cost and schedule overruns in public projects. Practical implications This study found that across the four cities, there are significant cost and schedule overruns. Projects in Hong Kong perform the worst in terms of cost and schedule, when compared to Beijing, Singapore and Sydney. The implication is that more attention should be paid to managing cost and schedule, especially in Hong Kong. Originality/value The originality is that the study discovered which areas project managers should focus on when managing public projects in different countries. In laissez-faire or free market economies, more attention should be paid to managing project cost and schedule. When a country has lower transparency index, more attention should be paid to controlling project quality. Project team members should focus on delivering public projects to the highest level of quality in developed countries.

Ohueri, C C, Enegbuma, W I, Wong, N H, Kuok, K K and Kenley, R (2018) Labour productivity motivation framework for Iskandar Malaysia. Built Environment Project and Asset Management, 8(03), 293–304.

Tanko, B L, Abdullah, F, Mohamad Ramly, Z and Enegbuma, W I (2018) An implementation framework of value management in the Nigerian construction industry. Built Environment Project and Asset Management, 8(03), 305–19.

Ugulu, R A and Allen, S (2018) Using the learning curve theory in the investigation of on-site craft gangs’ blockwork construction productivity. Built Environment Project and Asset Management, 8(03), 267–80.